Replacement timeline
From allotment letter through cutover
Cities and Advisors run on different clocks. Cycle Steward sits on the PSAP side so leftover, TD-284, and the 90-day pack do not collide.
Method: leftover-gated scope (PMBOK scope/risk), stakeholder seats (director, finance, Advisor), ENP-style ops (live floor, tabletop cutover), owner-rep seating with the vendor. PMP is in progress — no invented PMI numbers.
PSAP + Advisor
Allotment
PSC-299 and the current allotment letter. This is the ceiling for the complete system plus residual-list items.
MPA contractor
Quoting
Live MPA quote for CPE. Steward reconciles allotment vs quote and flags extras that are residual-list vs local-fund.
PSAP Manager
Item 4 request
You send the pre-approval letter (we draft). Advisor reviews SOW, certs, NTE. Goal: a TD-288 consulting line during replacement.
Finance / purchasing
City file
Professional-services PO or agreement. This is what Accounts Payable will pay. Implementation hours wait on that paper.
Vendor PM
Install
Design, install, MAC quotes, acceptance test. Steward sits on the existing implementation call as owner-rep and keeps the residual ceiling current.
PSAP chair + Steward
Cutover
Tabletop, fallback, 240-hour watch. Center still answers 9-1-1. Vendor still owns the switch.
PSAP signs
TD-284
Acceptance. Steward starts the 90-day residual clock the same day.
Steward + finance
Day 0–90
Consulting invoice plus other leftover quotes (GIS, furniture, chairs, headsets) that fit. Package to the Advisor.
PSAP + AP
TD-290
City pays the Steward on reimbursement. TD-290 within 12 months. Cal OES is not your Accounts Payable for this line.
Who sits where
Signs Branch letters, city requisitions, TD-284, TD-290. Names Advisor, finance, vendor PM.
Does not: Run the vendor install.
Vendor file, PO, pay invoices, proof of payment.
Does not: Interpret Chapter III.
Allotment, TD-288, residual pre-approval.
Does not: Be the project manager.
SETNA policy and residual list.
Does not: Day-to-day vendor tasking.
System design, install, acceptance test, 5-year maintenance.
Does not: Own the residual clock or renegotiate MPA for us.
PSAP-side cycle, quote hygiene, Friday brief, cutover watch, residual pack.
Does not: Sell CPE, configure the switch, or speak as the Branch.